This project was finished in September 2014. It consisted of almost 1,100 tons of HMA over a 6″ modified sub-base, along with 340 feet of curb and gutter.
This project was finished in September 2014. It consisted of almost 1,100 tons of HMA over a 6″ modified sub-base, along with 340 feet of curb and gutter.