Jensen’s 14th crossing of the Missouri River
7-year project includes 18 bridges
Deepest drill shafts in Louisiana at time of project
Jensen’s 13th time crossing the Missouri River
Drill shafts 86’ below the water’s surface
Pedestrian Bridge connecting 15 miles of recreational trails
1.7 Mile Bridge crosses Lake Dallas, Texas
Three year long project
Removal and replacement of 470' bridge
Replacement of a 870' bridge