The high trestle trail job was a difficult job with challenging access to the site, including lengthy backups over a narrow bridge, 130 feet above the Des Moines River. Central Iowa Ready Mix was awarded for Excellence on Recreational Trails and Paths on this project.
Project Statistics
Yards:
2,000
Trucks:
200 Loads
Temperature:
Freezing to High Heat
Time of Year:
Spring & Summer 2010